Kitfox Aircraft Stick and Rudder Stein Air Grove Aircraft TCW Technologies Dynon Avionics AeroLED MGL Avionics Leading Edge Airfoils Desser EarthX Batteries Garmin G3X Touch
Results 1 to 6 of 6

Thread: VGs and FAA requirements

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    N981MS's Avatar
    Join Date
    Dec 2012
    Location
    Dexter, GA
    Posts
    161

    Default Re: VGs and FAA requirements

    No need for an A&P. Anyone can work on an Experimental.

    Not to be a stick in the mud but:
    Your OP limits probably reference this:


    § 21.93 Classification of changes in
    type design.
    (a) In addition to changes in type design
    specified in paragraph (b) of this
    section, changes in type design are
    classified as minor and major.
    A
    "minor change’’ is one that has no appreciable
    effect on the weight, balance,

    structural strength, reliability, operational
    characteristics, or other characteristics
    affecting the airworthiness
    of the product. All other changes are
    ‘‘major changes’’

    I think VGs would qualify as a "major change" to some at the FAA. Our FSDO (Atlanta) was easy to deal with on a prop and slat removal change. I called with our plan. 5 hours flight testing of climbs, descents, stalls, and handling at various load configurations in the typical geographic area. He took down our N Number and that was it. 5 hours later and a logbook entry and we were done. I am not sure if there is a specified amount of time so you might request less.

    It is not a big deal unless you can't get the testing done before some planned long trip or passenger carrying.

    FWIW
    Maxwell
    Maxwell Duke

    Kitfox S6 IO-240 Built it (Flying since 2003)
    Maule M7-235C Sold it (liked it though)
    RV-10 IO-540 Bought it
    Zenith CH-750 Built with 7 friends (DAR Vic Syracuse)

  2. #2

    Join Date
    Nov 2014
    Location
    Gainesville, tx
    Posts
    79

    Default Re: VGs and FAA requirements

    That was what I was questioning. 5hrs is not a big deal so I can put it in phase 1 and fly it off with a log book entry and be ok? Sounds like a call to fsdo is in order.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •