Holes are drilled, and life is good for now. Dropped the pins in, and dihedral, sweep and twist are all where they were before drilling. Today was lift strut spar bracket day. Three are done, but I just did a head count on 1/8 x 1/8 SS rivets and discovered that I must have lost a few. I need 42 for the rear bracket, and have 22 in the bag. I had to drill out a couple in the preceeding work because the heads werent flush with the bracket


And of course, as with many other things, I will be waiting again. Normally it is for the post office. But this time it is because OSH is going and KF is closed until the 2nd. I need to order more Loctite 9460 and the additional pop rivets. Time for a break I guess.