Hi,

I noticed that the factory is giving 1000 hours or 18 month as average build time. Even 200 hours less with quick build wings. Looking at the builder websites, this looks VERY optimistic: 800 hours / 18 months = 44,5 hour per month = 11 hours per week.

How realistic is that build time given by the factory? I am talking about a 7 STi with Rotax engine. No fancy (time consuming) modifications.

Thanks