I understood that you needed 1" of overlap on a structural point where it is necessary to overlap the covering material. My SS7 has 1/2" diameter tubing. The maximum overlap I can figure out how to get is 1/4 of a circumference of the circle - or 0.39" Am I misinterpreting the spec?

Thanks
tom