Today, I hung the wings for the final time, checked flaperon travel, wing alignment (again), mounted wing tips, ran tip lighting, check lighting, attached mass balances, etc,. Tomorrow I will connect the wing tanks to the header, run the engine off of the wing tanks, complete the pitot system plumbing, etc., and possibly do the weight and balance. Pitot/static is scheduled for Wednesday, and the FAA signoff soon after that (hopefully). First flight is getting close.
Bruce Estes
Classic IV
Rotax 912S
IVO ifa